tencent cloud

Data Accelerator Goose FileSystem

Release Notes and Announcements
Release Notes
Product Selection Guide
GooseFSx
Product Introduction
Quick Start
Purchase Guide
Console Guide
Tool Guide
Practical Tutorial
Service Level Agreement
Glossary
GooseFS
Product Introduction
Billing Overview
Quick Start
Core Features
Console Guide
Developer Guide
Client Tools
Cluster Configuration Practice
Data Security
Service Level Agreement
GooseFS-Lite
GooseFS-Lite Tool
Practical Tutorial
Use GooseFS in Kubernetes to Speed Up Spark Data
Access Bucket Natively with POSIX Semantics Using GooseFS
GooseFS Distributedload Tuning Practice
FAQs
GooseFS Policy
Privacy Policy
Data Processing And Security Agreement

Task Management

PDF
포커스 모드
폰트 크기
마지막 업데이트 시간: 2025-07-17 17:42:52

Overview

Creating, managing, and deleting GooseFS clusters are all considered asynchronous task processing. You can manage all cluster-related tasks through the GooseFS console on the GooseFS cluster details page. Below is a detailed introduction to how to manage GooseFS cluster tasks.

Directions

2. In the left navigation, click GooseFS > Instance List to enter the GooseFS Cluster List Page.
3. Click the GooseFS cluster ID/name that needs to be managed, enter the cluster details page, click the Task Center option in the sidebar, and enter the task management subpage.
4. Based on the date to be queried, select the task list within the corresponding date range, with optional parameters including.
Support querying task status within a specific number of days, such as today, the last 3 days, the last 7 days, or the last 30 days' task list.
Selected time range: Support querying the task list within a specified time window.
5. In the task list, you can click Task ID/name or the View Steps button to view task steps via the console side drawer.
6. In the task steps, you can click specific process to view the execution status, creation time, and end time of each step's detailed process in the pop-up window.
Note:
Task Center does not currently support pausing tasks or restarting tasks. If you need to restart a task, return to the interactive page of the corresponding operation and re-execute it. For example, to restart a scale-out node task, you need to return to the node management page and re-execute the add nodes operation.

도움말 및 지원

문제 해결에 도움이 되었나요?

피드백