Overview
Creating, managing, and deleting GooseFS clusters are all considered asynchronous task processing. You can manage all cluster-related tasks through the GooseFS console on the GooseFS cluster details page. Below is a detailed introduction to how to manage GooseFS cluster tasks.
Directions
2. In the left navigation, click GooseFS > Instance List to enter the GooseFS Cluster List Page.
3. Click the GooseFS cluster ID/name that needs to be managed, enter the cluster details page, click the Task Center option in the sidebar, and enter the task management subpage.
4. Based on the date to be queried, select the task list within the corresponding date range, with optional parameters including.
Support querying task status within a specific number of days, such as today, the last 3 days, the last 7 days, or the last 30 days' task list.
Selected time range: Support querying the task list within a specified time window.
5. In the task list, you can click Task ID/name or the View Steps button to view task steps via the console side drawer.
6. In the task steps, you can click specific process to view the execution status, creation time, and end time of each step's detailed process in the pop-up window.
Note:
Task Center does not currently support pausing tasks or restarting tasks. If you need to restart a task, return to the interactive page of the corresponding operation and re-execute it. For example, to restart a scale-out node task, you need to return to the node management page and re-execute the add nodes operation.