tencent cloud

Tencent Cloud TCHouse-D

Product Introduction
Overview
Concepts
Cluster Architecture
Strengths
Scenarios
Purchase Guide
Billing Overview
Renewal Instructions
Overdue Policy
Refund Instructions
Configuration Adjustment Billing Instructions
Getting Started
Using Tencent Cloud TCHouse-D Through the Console
Using Tencent Cloud TCHouse-D Through a Client
Operation Guide
Cluster Operation
Monitoring and Alarm Configuration
Account Privilege Management
Data Management
Query Management
Modify Configurations
Node Management
Log Analysis
SQL Studio
Enabling Resource Isolation
Development Guide
Design of Data Table
Importing Data
Exporting Data
Basic Feature
Query Optimization
Ecological Expansion Feature
API Documentation
History
Introduction
API Category
Making API Requests
Cluster Operation APIs
Database and Table APIs
Cluster Information Viewing APIs
Hot-Cold Data Layering APIs
Database and Operation Audit APIs
User and Permission APIs
Resource Group Management APIs
Data Types
Error Codes
Cloud Ecosystem
Granting CAM Policies to Sub-accounts
Query Acceleration for Tencent Cloud DLC
Practical Tutorial
Basic Feature Usage
Advanced Features Usage
Resource Specification Selection and Optimization Suggestions
Naming Specifications and Limits to the Database and Data Table
Table Design and Data Import
Query Optimization
Suggested Usage to Avoid
Accessing TCHouse-D via JDBC over the Public Network
Performance Testing
TPC-H Performance Testing
SSB Performance Testing
TPC-DS Performance Testing
FAQs
Common Operational Issues
Common Errors
Contact Us
Glossary
Product Policy
Service Level Agreement
Privacy Policy
Data Processing And Security Agreement
DocumentaçãoTencent Cloud TCHouse-DPurchase GuideConfiguration Adjustment Billing Instructions

Configuration Adjustment Billing Instructions

PDF
Modo Foco
Tamanho da Fonte
Última atualização: 2024-12-20 16:35:46

Monthly Subscription Cluster

Cluster Upgrade

Cluster upgrade follows a daily differential charge model, where the upgrade fee is calculated as follows: Upgrade fee = (New specification price post-upgrade - Original specification price pre-upgrade) x Number of days for configuration adjustment/(365/12) x Applicable discount.
Number of days for configuration adjustment: Resource expiration time - Current time.
Applicable discount: The discount in effect on the live network.
Configuration upgrade doesn't affect the resource expiration time.
The configuration upgrade fee can be paid with your promo vouchers and platform-gifted balance (free credit).
Example:
Assuming a user purchased 5 units of TCHouse-D Cluster Standard 4-core 16 GB machines in Singapore on January 1, 2023, at a unit price of 122.8 USD per month. On October 10, 2023, the configuration was upgraded to 8-core 32 GB, with a unit price of 245.6 USD per month, and a discount of 20%. The upgrade fee calculation process is as follows:
Monthly upgrade price difference: The price difference per machine is 245.6 - 122.8 = 122.8 USD/month.
Number of days for upgrade: 21 days
Applicable discount: 20%
Upgrade fee = (245.6 - 122.8) x 21/(365/12) x 0.8 x 5 = 399.13 USD.

Cluster Downgrade

Cluster downgrade follows the principle refund first, then repurchase: Cluster downgrade refund amount = cluster refund fee - new specification repurchase fee, where the cluster refund fee calculation rules can be found in the Refund Instructions.
If the refund amount is greater than 0, after the downgrade is implemented, the refund will be returned to your Tencent Cloud account via the original payment method.
If the refund amount is less than or equal to 0, after the downgrade is implemented, the refund amount will be considered 0, and no additional charges will be applied for any excess fees.
If discounts or promo vouchers were used during the purchase, they will not be returned.

Pay-as-You-Go Cluster

Billing rules remain unchanged after configuration adjustment, and fees are settled hourly based on the cluster configuration at the time of each deduction.


Ajuda e Suporte

Esta página foi útil?

comentários