tencent cloud

Service Registry and Governance

Upgrading the Gateway Specifications

PDF
Mode fokus
Ukuran font
Terakhir diperbarui: 2026-05-07 17:26:54

Overview

If the gateway instance specifications do not meet your business requirements, you can increase the number of gateway nodes and node specifications in the console.
Note
If you need to reduce the number of gateway nodes and node specifications, please submit a ticket.

Prerequisites

The gateway instance is in the Running/Upgrade failed state.

Changing the Node Specifications

1. Log in to Microservices Platform Console, in the left sidebar, click Cloud Native Intelligent Gateway > Instance List.
2. On the instance list page, select the "ID" of the gateway instance to be configured and go to its basic information page, where you can view the instance's basic information.
3. In the Node Configuration module, click Modify at the node specification to go to the Node Modification Page.
4. On the specification change page, select the target node specifications and click Confirm. In the confirmation pop-up window, select Confirm. The instance upgrade takes approximately 3 - 5 minutes to complete. You can check the task status in the status bar in the gateway list.

Changing the Number of Nodes

1. Log in to Microservices Platform Console, in the left sidebar, click Cloud Native Intelligent Gateway > Instance List.
2. On the instance list page, click the "ID" of the newly created instance to go to the gateway instance basic information page and view the basic information of the instance.
3. In the Node Configuration module, click Modify at the number of nodes to go to the Node Modification Page.
4. On the modification page, select the target number of nodes and click Confirm. In the confirmation pop-up window, select Confirm. The instance upgrade takes approximately 3 - 5 minutes to complete. You can check the task status in the status bar in the gateway list.

Bantuan dan Dukungan

Apakah halaman ini membantu?

masukan