tencent cloud

Data Transfer Service

Release Notes and Announcements
Release Notes
Announcements
Product Introduction
Overview
Data Migration
Data Sync
Data Subscription (Kafka Edition)
Strengths
Supported Regions
Specification Description
Purchase Guide
Billing Overview
Configuration Change Description
Payment Overdue
Refund
Getting Started
Data Migration Guide
Data Sync Guide
Data Subscription Guide (Kafka Edition)
Preparations
Business Evaluation
Network Preparation
Adding DTS IP Addresses to the Allowlist of the Corresponding Databases
DTS Service Permission Preparation
Database and Permission Preparation
Configuring Binlog in Self-Built MySQL
Data Migration
Databases Supported by Data Migration
Cross-Account TencentDB Instance Migration
Migration to MySQL Series
Migrating to PostgreSQL
Migrating to MongoDB
Migrating to SQL Server
Migrating to Tencent Cloud Distributed Cache
Task Management
Data Sync
Databases Supported by Data Sync
Cross-Account TencentDB Instance Sync
Sync to MySQL series
Synchronize to PostgreSQL
Synchronization to MongoDB
Synchronize to Kafka
Task Management
Data Subscription (Kafka Edition)
Databases Supported by Data Subscription
MySQL series Data Subscription
Data Subscription for TDSQL PostgreSQL
MongoDB Data Subscription
Task Management
Consumption Management
Fix for Verification Failure
Check Item Overview
Cutover Description
Monitoring and Alarms
Supported Monitoring Indicators
Supported Events
Configuring Metric Alarms and Event Alarms via the Console
Configuring Indicator Monitoring and Event Alarm by APIs
Ops Management
Configuring Maintenance Time
Task Status Change Description
Practical Tutorial
Synchronizing Local Database to the Cloud
Creating Two-Way Sync Data Structure
Creating Many-to-One Sync Data Structure
Creating Multi-Site Active-Active IDC Architecture
Selecting Data Sync Conflict Resolution Policy
Using CLB as Proxy for Cross-Account Database Migration
Migrating Self-Built Databases to Tencent Cloud Databases via CCN
Best Practices for DTS Performance Tuning
FAQs
Data Migration
Data Sync
FAQs for Data Subscription Kafka Edition
Regular Expressions for Subscription
Error Handling
Common Errors
Failed Connectivity Test
Failed or Alarmed Check Item
Inability to Select Subnet During CCN Access
Slow or Stuck Migration
Data Sync Delay
High Data Subscription Delay
Data Consumption Exception
API Documentation
History
Introduction
API Category
Making API Requests
(NewDTS) Data Migration APIs
Data Sync APIs
Data Consistency Check APIs
(NewDTS) Data Subscription APIs
Data Types
Error Codes
DTS API 2018-03-30
Service Agreement
Service Level Agreements

Task Status Description

PDF
フォーカスモード
フォントサイズ
最終更新日: 2024-07-08 19:09:49

Billable task status description

Note
A monthly subscribed task is billed upon purchase. A pay-as-you-go task is free of charge during configuration and will incur fees only when it runs normally, and billing will stop when it is paused.
The Renew button is displayed only for monthly subscribed task instances.
The Postpaid-to-Prepaid button is displayed only for pay-as-you-go task instances.
Status
Description
Supported Operations
Uninitialized
The purchase has been completed, but no sync task has been configured.
View, Configure, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Initialized
The sync task has been configured.
View, Configure, Verify, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Checking
The sync task is being checked.
View, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Verification passed
The sync task passed the verification.
View, Configure, Start, Verify, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Verification failed
The sync task failed the verification.
View, Configure, Verify, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Preparing
The sync task is ready to start after passing the verification.
View, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Running
The sync task is running.
View, Pause, Stop, Modify Sync Configuration, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Task error
The sync task was interrupted during sync due to an exception. You can click Retry to resume the task in the console.
View, Retry, Stop, Adjust Specification, Postpaid-to-Prepaid, Renew, Renew, Terminate/Return
Retrying
The task is being retried after you click Retry.
View, Stop, Adjust Specification, Postpaid-to-Prepaid, Renew, Terminate/Return
Pausing
The sync task is being paused after you click Pause.
View, Terminate/Return
Paused
The task is paused. If it is paused for more than seven days, it will fail.
View, Resume, Stop, Terminate/Return
Resuming
The paused task is being resumed. After it is resumed, its status will become Running.
View, Terminate/Return
Stopping
The task is being stopped after you click Stop. Once stopped, it cannot be resumed.
View, Terminate/Return
Stopped
The sync task has ended.
View, Terminate/Return, Reset
Resetting
The stopped task is being reset. You can reset it to clear the old task configuration. After the task status becomes Uninitialized, you can configure a new sync task.
View, Terminate/Return
Task failed
The sync task failed.
View, Terminate/Return
Adjusting specification
The task specification is being adjusted after you click Adjust Specification.
View, Renew
Isolating
The task instance is being isolated after you click Terminate/Return.
The task instance is being isolated by the system automatically upon expiration or one day after your account has overdue payments.
View, Renew, Delete Instantly
Isolated
The task is isolated after you click Terminate/Return or it is moved to the recycle bin due to expiration or overdue payments.
The task is isolated due to expiration or overdue payments. It can be restored after it is renewed or your account balance is topped up.
View, Deisolate/Resume, Renew, Delete Instantly
Resuming
The task is being restored. If a pay-as-you-go task is isolated after you click Terminate, you can click Deisolate/Resume to restore it.
View
Deleting
The task is being deleted automatically seven days after it was isolated, and its data will be cleared permanently.
View
Topping up
The account balance is being topped up, and the pay-as-you-go task moved to the recycle bin due to expiration or overdue payments can be restored.
View, Renew
Renewing
The monthly subscribed task is being renewed.
View

Free task status description

Status
Description
Supported Operations
Uninitialized
The purchase has been completed, but no sync task has been configured.
View, Configure, Delete
Initialized
The sync task has been configured.
View, Configure, Verify, Delete
Checking
The sync task is being checked.
View, Delete
Verification passed
The sync task passed the verification.
View, Configure, Start, Verify, Delete
Verification failed
The sync task failed the verification.
View, Configure, Verify, Delete
Preparing
The sync task is ready to start after passing the verification.
View, Delete
Running
The sync task is running.
View, Pause, Stop, Delete
Task error
The sync task was interrupted during sync due to an exception. You can click Retry to resume the task in the console.
View, Retry, Stop, Delete
Retrying
The task is being resumed after you click Retry.
View, Stop, Delete
Stopping
The task is being stopped after you click Stop.
View, Delete
Stopped
The task is stopped.
View, Delete
Task failed
The sync task failed.
View, Delete
Deleting
The task is being deleted after you click Delete. Once deleted, it cannot be restored, and its resources will be cleared.
View


ヘルプとサポート

この記事はお役に立ちましたか?

フィードバック