tencent cloud

Data Transfer Service

Release Notes and Announcements
Release Notes
Announcements
Product Introduction
Overview
Data Migration
Data Sync
Data Subscription (Kafka Edition)
Strengths
Supported Regions
Specification Description
Purchase Guide
Billing Overview
Configuration Change Description
Payment Overdue
Refund
Getting Started
Data Migration Guide
Data Sync Guide
Data Subscription Guide (Kafka Edition)
Preparations
Business Evaluation
Network Preparation
Adding DTS IP Addresses to the Allowlist of the Corresponding Databases
DTS Service Permission Preparation
Database and Permission Preparation
Configuring Binlog in Self-Built MySQL
Data Migration
Databases Supported by Data Migration
Cross-Account TencentDB Instance Migration
Migration to MySQL Series
Migrating to PostgreSQL
Migrating to MongoDB
Migrating to SQL Server
Migrating to Tencent Cloud Distributed Cache
Task Management
Data Sync
Databases Supported by Data Sync
Cross-Account TencentDB Instance Sync
Sync to MySQL series
Synchronize to PostgreSQL
Synchronization to MongoDB
Synchronize to Kafka
Task Management
Data Subscription (Kafka Edition)
Databases Supported by Data Subscription
MySQL series Data Subscription
Data Subscription for TDSQL PostgreSQL
MongoDB Data Subscription
Task Management
Consumption Management
Fix for Verification Failure
Check Item Overview
Cutover Description
Monitoring and Alarms
Supported Monitoring Indicators
Supported Events
Configuring Metric Alarms and Event Alarms via the Console
Configuring Indicator Monitoring and Event Alarm by APIs
Ops Management
Configuring Maintenance Time
Task Status Change Description
Practical Tutorial
Synchronizing Local Database to the Cloud
Creating Two-Way Sync Data Structure
Creating Many-to-One Sync Data Structure
Creating Multi-Site Active-Active IDC Architecture
Selecting Data Sync Conflict Resolution Policy
Using CLB as Proxy for Cross-Account Database Migration
Migrating Self-Built Databases to Tencent Cloud Databases via CCN
Best Practices for DTS Performance Tuning
FAQs
Data Migration
Data Sync
FAQs for Data Subscription Kafka Edition
Regular Expressions for Subscription
Error Handling
Common Errors
Failed Connectivity Test
Failed or Alarmed Check Item
Inability to Select Subnet During CCN Access
Slow or Stuck Migration
Data Sync Delay
High Data Subscription Delay
Data Consumption Exception
API Documentation
History
Introduction
API Category
Making API Requests
(NewDTS) Data Migration APIs
Data Sync APIs
Data Consistency Check APIs
(NewDTS) Data Subscription APIs
Data Types
Error Codes
DTS API 2018-03-30
Service Agreement
Service Level Agreements

Configuring Maintenance Time

PDF
フォーカスモード
フォントサイズ
最終更新日: 2024-07-08 15:54:46

Overviews

The DTS system will regularly perform task upgrades to accommodate legacy tasks' use of newly launched features. Set a maintenance time window so that the system can perform the upgrade within the time window you have set.
After a task is created, a default maintenance time is generated, which is 3:00 AM to 4:00 AM daily. Users can view and modify this on the Task Details page.

Application Scope

All tasks related to data migration, data synchronization, and data subscription.

Notes

The maintenance time window cannot be closed. Please choose off-peak business hours for maintenance, typically from 3:00 AM to 4:00 AM.
Ask users to [ Configure Event Alarm ] in advance (https://www.tencentcloud.com/document/product/571/90079?from_cn_redirect=1!1a380543dc68d16a5554181c18f6b7bf), so that they can receive notifications of task upgrades 24 hours before the system upgrade.

Service Impact

During the system upgrade, there will be a momentary disconnection lasting 1 second to 5 seconds. After the upgrade, the task will automatically restart, ensuring continuous data transmission.

Directions

1. Log in to the DTS console , choose the Data Migration/Data Sync/Data Subscription page in the left sidebar, then select the specified task, choose Operation column, and select More > View .
2. In Task Details > Maintenance Info, click Edit to modify the maintenance information.

3. After modifying the maintenance time, click OK.
Configure the off-peak period of your business as the DTS maintenance time, selecting at least one day each week.


ヘルプとサポート

この記事はお役に立ちましたか?

フィードバック