tencent cloud

Data Transfer Service

Release Notes and Announcements
Release Notes
Announcements
Product Introduction
Overview
Data Migration
Data Sync
Data Subscription (Kafka Edition)
Strengths
Supported Regions
Specification Description
Purchase Guide
Billing Overview
Configuration Change Description
Payment Overdue
Refund
Getting Started
Data Migration Guide
Data Sync Guide
Data Subscription Guide (Kafka Edition)
Preparations
Business Evaluation
Network Preparation
Adding DTS IP Addresses to the Allowlist of the Corresponding Databases
DTS Service Permission Preparation
Database and Permission Preparation
Configuring Binlog in Self-Built MySQL
Data Migration
Databases Supported by Data Migration
Cross-Account TencentDB Instance Migration
Migration to MySQL Series
Migrating to PostgreSQL
Migrating to MongoDB
Migrating to SQL Server
Migrating to Tencent Cloud Distributed Cache
Task Management
Data Sync
Databases Supported by Data Sync
Cross-Account TencentDB Instance Sync
Sync to MySQL series
Synchronize to PostgreSQL
Synchronization to MongoDB
Synchronize to Kafka
Task Management
Data Subscription (Kafka Edition)
Databases Supported by Data Subscription
MySQL series Data Subscription
Data Subscription for TDSQL PostgreSQL
MongoDB Data Subscription
Task Management
Consumption Management
Fix for Verification Failure
Check Item Overview
Cutover Description
Monitoring and Alarms
Supported Monitoring Indicators
Supported Events
Configuring Metric Alarms and Event Alarms via the Console
Configuring Indicator Monitoring and Event Alarm by APIs
Ops Management
Configuring Maintenance Time
Task Status Change Description
Practical Tutorial
Synchronizing Local Database to the Cloud
Creating Two-Way Sync Data Structure
Creating Many-to-One Sync Data Structure
Creating Multi-Site Active-Active IDC Architecture
Selecting Data Sync Conflict Resolution Policy
Using CLB as Proxy for Cross-Account Database Migration
Migrating Self-Built Databases to Tencent Cloud Databases via CCN
Best Practices for DTS Performance Tuning
FAQs
Data Migration
Data Sync
FAQs for Data Subscription Kafka Edition
Regular Expressions for Subscription
Error Handling
Common Errors
Failed Connectivity Test
Failed or Alarmed Check Item
Inability to Select Subnet During CCN Access
Slow or Stuck Migration
Data Sync Delay
High Data Subscription Delay
Data Consumption Exception
API Documentation
History
Introduction
API Category
Making API Requests
(NewDTS) Data Migration APIs
Data Sync APIs
Data Consistency Check APIs
(NewDTS) Data Subscription APIs
Data Types
Error Codes
DTS API 2018-03-30
Service Agreement
Service Level Agreements

Task Status Description

PDF
フォーカスモード
フォントサイズ
最終更新日: 2024-07-08 20:31:47

Billable task status description

Note:
Full migration is free of charge. Fees are incurred only during normal incremental migration (including data consistency check). When the task ends or is paused, billing will also stop.
If you select Structural migration or Full migration for Migration Type, no fees will be incurred.
If you select Full + Incremental migration for Migration Type, during source database export and data import, full migration is performed free of charge. During subsequent incremental sync, incremental migration is performed and billing starts. When you click Complete, the task ends and billing stops.
Status
Description
Supported Operations
Creation completed
A data migration resource has been purchased.
View, Configure, Adjust Specification, Terminate
Checking
The migration task is being checked.
View, Adjust Specification, Terminate
Verification passed
The migration task passed the verification.
Immediate start, View, Configure, Verify, Adjust Specification, Terminate
Verification failed
The migration task failed the verification.
View, Configure, Verify, Adjust Specification, Terminate
Preparing
The verification has been completed, and data migration is ready to start.
View, Stop, Adjust Specification, Terminate
Running
The migration task is running.
View, Stop, Create Consistency Check Task (displayed only for supported links), Pause, Adjust Specification, Terminate
Pausing
The task is being paused.
View, Terminate
Paused
The task is paused. We recommend you pause a task for no longer than seven days; otherwise, the task will fail.
View, Stop, Resume, Terminate, Adjust Specification
Resuming
The paused migration task is being resumed. After it is resumed, its status will become Running.
View, Terminate
Prepared
When the task enters the Incremental Sync stage, the Complete button will be displayed, and you can click it to end the migration task.
View, Complete, Stop, Create Consistency Check Task (displayed only for supported links), Pause, Adjust Specification, Terminate
Completing
The incremental migration task is being completed after you click Complete to end it in the *Incremental Sync** stage.
View, Adjust Specification, Terminate
Task successful
The migration task is successfully completed.
View, Adjust Specification, Terminate
Task error
The migration task was interrupted during migration due to an exception. You can click Retry to resume the task in the console.
View, Stop, Retry, Adjust Specification, Terminate
Resuming
The task is being resumed after you click Retry.
View, Adjust Specification, Terminate
Task failed
The migration task failed and couldn't be resumed.
View, Retry (only available for Redis migration), Adjust Specification, Terminate
Stopping
The task is being stopped after you click Stop. A stopped task cannot be resumed, but the migration link record will be retained.
View, Adjust Specification, Terminate
Stopped
The task is stopped after you click Stop.
View, Adjust Specification, Terminate
Adjusting specification
The task specification is being adjusted after you click Adjust Specification.
View
Isolating
The task is being isolated after you click Terminate. Its resources will be cleared automatically in seven days after termination.
The task is being isolated by the system automatically one day after your account has overdue payments.
View
Isolated
The task is isolated after you terminate it or it is moved to the recycle bin one day after your account has overdue payments. It will be retained in the recycle bin for seven days.
View, Deisolate/Resume, Delete
Resuming
The task is being restored. If a pay-as-you-go task is isolated after you click Terminate, you can click Deisolate/Resume to restore it.
View
Deleting
The task is being deleted automatically seven days after it was isolated, and its data will be cleared permanently.
The task is being deleted after you click Delete.
View
Topping up
The account balance is being topped up, and the task moved to the recycle bin due to overdue payments can be restored.
View

Free task status description

Status
Description
Supported Operations
Creation completed
A data migration resource has been purchased.
View, Configure, Delete
Checking
The migration task is being checked.
View, Delete
Verification passed
The migration task passed the verification.
View, Configure, Verify, Start, Delete
Verification failed
The migration task failed the verification.
View, Configure, Verify, Delete
Preparing
The verification has been completed, and data migration is ready to start.
View, Stop, Delete
Running
The migration task is running.
View, Stop, Delete
Prepared
When the task enters the Incremental Sync stage, the Complete button will be displayed, and you can click it to end the incremental migration task.
View, Stop, Complete, Delete
Completing
The incremental migration task is being completed after you click Complete to end it in the *Incremental Sync** stage.
View, Delete
Task successful
The migration task is successfully completed.
View, Delete
Task error
The migration task was interrupted during migration due to an exception. You can click Retry to resume the task in the console.
View, Stop, Retry, Delete
Resuming
The task is being resumed after you click Retry.
View, Delete
Task failed
Migration task failed
View, Delete
Stopping
The task is being stopped after you click Stop. A stopped task cannot be resumed, but the migration link record will be retained.
View, Delete
Stopped
The task is stopped after you click Stop.
View, Delete


ヘルプとサポート

この記事はお役に立ちましたか?

フィードバック